The project includes the preparation and design of the master plan and the infrastructure for the residential development located on Birzeit-Burham Road. The total built up area is about 125,000 square meter on the site which has a total area of 88,000 square meter. Total estimated cost of the project is 60 million USD including construction of resident buildings and the infrastructure. The consultancy is performed in cooperation with Sigma, Jordan and EMC.
UG along with Sigma and EMC provided the following services:
- Re-design of the Master Plan, including roads layout
- Preparation of Land-Use Plan
- Preparation of the Roads and Circulation Plans
- Preparation of the Water and Wastewater Plans
- Preparation of the Electring and Street Lighting Plans
- Preparation of the Buildings Architectural, Structural and
Electromechanical Design