Beit Wazan Mosque Committee

Beit Wazan – Nablus

US $ 400,000

1999-2002

The mosque contains three floors, which are the basement floor, ground floor, and mezzanine floor.

 

  • The basement floor includes of dispensary, kindergarten, and mosque services like toilets.
  • The ground floor contains the main hall for men prayers of 400m2 area and this hall can accommodate 650 persons.
  • The first or mezzanine floor is a special hall for women prayers with 150m2 area, which can accommodate 250 persons.

Services provided by Universal Group for Engineering and Consulting (UG) in association  with Electro-Mechanical Firm (UNECO). These services include  the followings:

 

  • Preparation of the Site Plan.
  • Performing Geotechnical Testing.
  • Preparing Architectural, Structural, Electrical, and Mechanical Design.
  • Preparing Tender Documents for the project.
  • Administration and Supervision for all Execution Process.