Al-Turath Islamic Committee

Al-A’zariah, Jerusalem

US $ 1,000,000

1999

The project is designed in two stages. The first  stage contains the first five floors, while the second stage contains three additional floors.

  • The ground floor is the parking floor which accommodates 17 cars.
  • The total area for the eight floors is about 3600m2.

Services provided by Universal Group for Engineering and Consulting (UG) in association  with Electro-Mechanical Firm (UNECO). These services includes the followings:

  • Preparation of the Site Plan.
  • Performing Geotechnical Testing.
  • Preparing Architectural, Structural, Electrical, and Mechanical Design.
  • Partial Supervision for Construction Works.