Constructing a Tunnel in Ras Al-Jora in Hebron

Conducting a traffic studies (origin destination study) and traffic volume study at intersections at Ras Al-Jora area at the Northern Entrance of Hebron.

  • O-D traffic study.
  • Performing traffic intersection study analysis.
  • Technical justification of need for a tunnel for through traffic.
  • Economic justification of need for a tunnel for through traffic.

 

UG has provided the following services:

  1. Traffic Study Report
  2. Economic Study report
Project Period

June 2015-Aug. 2015

Project Location

Hebron, West Bank, Palestine