The project includes the study, planning and design of access and internal roads for Al-Zuqum New Town Tubruq District (16.5km). All in cooperation with …………….
- Master planning of internal roads
- Planning and design of Main Roads
- Preparation of road design plan for internal roads
- Design of key intersections
- Design of proper traffic control plan
UG has provided the following services:
- Participation in the preparation of the land use/ road master plan
- Horizontal and vertical alignment geometric design
- Cross section geometric design for the various road classes
- Preparation of preliminary tender documents
- Stormwater drainage