Nablus local industrial Estate

The project involves performing the feasibility engineering studies for Nablus Industrial Estate. The facility lies on about 10 dunums located on the in the eastern part of Nablus City on the municipal boundaries.

  1. Planning of the Local Industrial Estate site
  2. Use of Geographic Information Systems in planning
  3. Planning of Infrastructure and Utilities
  4. Environmental Assessment
  5. Determination of the Initial Development Phase Requirements

UG has provided the following services:

  1. Developing the Site Plan
  2. Determining Existing Infrastructure and Utilities
  3. Environmental Considerations and Assessment
  4. Initial Design of Roads
  5. Initial Design of Water and Wastewater Utilities
  6. Initial Design of  Electricity and Telecommunication Utilities
  7. Preparing the Cost Estimate
Project Period

June 2001-September 2001

Project Location

Nablus - Westbank